Crews detach, tow away bridge ‘bulge’

SHINE — With its draw-span tower still attached, the largest of four east-half Hood Canal Bridge sections — the 928-foot flanking pontoons known as “the bulge” — was detached and towed north toward Canada late Thursday afternoon.

“It was a big day,” said Jamie Swift, Hood Canal Bridge project spokesman, who witnessed the effort to pull out the section, which was the equivalent of more than three football fields long.

The bridge closed a week ago for six weeks during replacement of the eastern half. That, plus the retrofit of the west-half — expected to be finished in 2010 — are estimated to cost the state Department of Transportation nearly $500 million.

The bridge’s entire eastern half is being towed north to Canada, where a Victoria developer is refurbishing the bridge floats in Cowichan for future marine uses, possibly for a marina and pier at Sidney on Vancouver Island.

West truss

Coming out next is the bridge’s west truss on the Jefferson County end of the bridge.

Swift said it would be removed beginning early this morning.

The DB General crane barge, the largest on the West Coast, will be brought in to lift the truss and place it on a barge.

Like the east truss, which was removed Monday from the Kitsap County side, its steel will be recycled.

Each truss weighs 180 tons.

The trusses, which allow the ridge to rise and fall with the ebb and flow of the tide, are attached to the land-based end structures of the bridge that support the vehicle on-ramps.

Progress on Thursday was a welcome change for workers after a more than a day of delay because of high wind on Tuesday and a forecast for stormy weather, which never developed, on Wednesday.

Gusting winds and 4-foot waves shut down passenger ferry service between the South Point dock on the Jefferson County side and the Lofall dock on the Kitsap shore all day Tuesday until 9 p.m.

That in turn idled transit service, except for some Starline Transportation coach runs around the bridge work site via state Highway 3 and U.S. Highway 101 from Port Gamble Park and Ride to Fred Hill Materials Shine Pit Park and Ride east and west of the bridge, respectively.

Once the old pontoons and road infrastructure are removed, three new U-shaped draw-span assembly pontoon sections will be replaced from west to east: first, a 943-foot section, then a 900-foot section and last, a 596-foot part.

Commuters can learn the status of Lofall-South Point water shuttle service by phoning 877-595-4222 or 5-1-1 or by checking www.hoodcanalbridge.com.

Additional get-around options include taking the Port Townsend-Edmonds evening ferry or the Port Townsend/Keystone ferry and Clinton-Mukilteo ferry, booking a private flight or boat service or driving around the canal on U.S. Highway 101.

________

Port Townsend-Jefferson County Editor Jeff Chew can be reached at 360-385-2335 or at jeff.chew@peninsuladailynews.com.

More in News

Crews work to remove metal siding on the north side of Field Arts & Events Hall on Thursday in Port Angeles. The siding is being removed so it can be replaced. (Dave Logan/for Peninsula Daily News)
Siding to be replaced

Crews work to remove metal siding on the north side of Field… Continue reading

Tsunami study provides advice

Results to be discussed on Jan. 20 at Field Hall

Chef Arran Stark speaks with attendees as they eat ratatouille — mixed roasted vegetables and roasted delicata squash — that he prepared in his cooking with vegetables class. (Elijah Sussman/Peninsula Daily News)
Nonprofit school is cooking at fairgrounds

Remaining lectures to cover how to prepare salmon and chicken

Port Townsend Main Street Program volunteers, from left, Amy Jordan, Gillian Amas and Sue Authur, and Main Street employees, Sasha Landes, on the ladder, and marketing director Eryn Smith, spend a rainy morning decorating the community Christmas tree at the Haller Fountain on Wednesday. The tree will be lit at 4 p.m. Saturday following Santa’s arrival by the Kiwanis choo choo train. (Steve Mullensky/for Peninsula Daily News)
Decoration preparation

Port Townsend Main Street Program volunteers, from left, Amy Jordan, Gillian Amas… Continue reading

Port Angeles approves balanced $200M budget

City investing in savings for capital projects

Olympic Medical Center Board President Ann Henninger, left, recognizes commissioner Jean Hordyk on Wednesday as she steps down after 30 years on the board. Hordyk, who was first elected in 1995, was honored during the meeting. (Paula Hunt/Peninsula Daily News)
OMC Commissioners to start recording meetings

Video, audio to be available online

Jefferson PUD plans to keep Sims Way project overhead

Cost significantly reduced in joint effort with port, city

Committee members sought for ‘For’ and ‘Against’ statements

The Clallam County commissioners are seeking county residents to… Continue reading

Christopher Thomsen, portraying Santa Claus, holds a corgi mix named Lizzie on Saturday at the Airport Garden Center in Port Angeles. All proceeds from the event were donated to the Peninsula Friends of Animals. (Dave Logan/for Peninsula Daily News)
Santa Paws

Christopher Thomsen, portraying Santa Claus, holds a corgi mix named Lizzie on… Continue reading

Peninsula lawmakers await budget

Gov. Ferguson to release supplemental plan this month

Clallam County looks to pass deficit budget

Agency sees about 7 percent rise over 2025 in expenditures

Officer testifies bullet lodged in car’s pillar

Witness says she heard gunfire at Port Angeles park