Video shows crew didn’t use electronic devices in train crash

Video shows crew didn’t use electronic devices in train crash

  • By PHUONG LE Associated Press
  • Sunday, December 24, 2017 11:00am
  • News

By Phuong Le

Associated Press

SEATTLE — Video from the cab of the Amtrak train that hurtled off the tracks in Washington state, killing three people and injuring dozens, shows that the engineer did not appear to be using a cellphone or any other personal electronic device just before the derailment, federal investigators said Friday.

The video and audio captured from a camera facing inside the cab also revealed that the engineer was heard commenting about the train’s speed just before the train crashed while traveling more than double the posted 30 mph speed limit. But authorities did not provide a transcript of what he said, saying only in a summary that “about six seconds prior to the derailment, the engineer made a comment regarding an over speed condition.”

The video also showed that the engineer did not place the train’s brake handle in the emergency-braking mode as the locomotive was recorded traveling 78 mph (126 kph), according to the preliminary details of an investigation by the National Transportation Safety Board.

The video recording “ended as the locomotive was tilting and the crew was bracing for impact” south of Seattle on Monday, the safety board said.

The train was carrying 85 passengers and crew members as it made its inaugural run along a fast, new 15-mile bypass route. Officials have said previously that another person was inside the locomotive’s cab being trained by the engineer.

Federal investigators trying to determine the cause of the wreck have gathered data from the locomotive’s event data recorder as well as inward- and outward-facing train cameras. They have said their full investigation could take more than a year.

NTSB board member Bella Dinh-Zarr said earlier this week that the locomotive’s emergency brake went off automatically and was not manually activated by the engineer.

Rail-safety experts have said the engineer should have activated the brake about a minute before the train reached the curve posted for 30 mph, and that not doing do strongly suggested that the engineer may have been distracted for an extended period. The engineer, who was among the injured, has not been identified and investigators have said they planned to speak with him soon.

None of the critical train speed-control technology that could have prevented a derailment was active on the section of track where the derailment happened before the train set off on its maiden voyage Monday.

Work to install the GPS-based technology known as positive train control is not expected to be completed until next spring on the newly opened span where the train derailed, according to Sound Transit, the public agency that owns the tracks.

Washington Gov. Jay Inslee, a Democrat, said on Wednesday that Amtrak had committed to making sure the technology will be in place statewide as soon as possible and before the Dec. 31, 2018 deadline.

Amtrak President and CEO Richard Anderson said in a statement Friday that the technology will make the entire U.S. railroad network safer.

“It is imperative that the rail industry urgently work together to get PTC activated on the national network as soon as possible — and certainly by the December 2018 federal deadline, if not before,” he said.

Passenger service along the rail line where the train derailed will not resume service until the advanced safety systems are in place, Washington transportation officials have said.

Experts have said it is likely the technology would have prevented Monday’s derailment in Washington state.

Rail crash data obtained by The Associated Press found that nearly 300 people have died in train crashes that could have been prevented if railroads across the U.S. implemented that critical speed-control technology.

— something federal safety investigators have been pushing for close to five decades.

Congress for years has extended the deadlines for railroads to implement positive train control.

On Friday, 15 Democratic U.S. senators, including Sens. Maria Cantwell and Patty Murray in Washington state, sent a letter to Transportation Secretary Elaine Chao saying it’s imperative that railroads put the technology in place before the December 2018 federal deadline.

Investigators have also said they are looking into whether the engineer was distracted by a second person in the cab or by something else. The other person inside the cab was an in-training conductor familiarizing himself with the route.

———

For complete coverage of the deadly derailment, click here: https://www.apnews.com/tag/TrainDerailment

Video shows crew didn’t use electronic devices in train crash
Video shows crew didn’t use electronic devices in train crash

More in News

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend, volunteer at the Martin Luther King Day of Service beach restoration on Monday at Fort Worden State Park. The activity took place on Knapp Circle near the Point Wilson Lighthouse. Sixty-four volunteers participated in the removal of non-native beach grasses. (Steve Mullensky/for Peninsula Daily News)
Work party

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend,… Continue reading

Portion of bridge to be replaced

Tribe: Wooden truss at railroad park deteriorating

Kingsya Omega, left, and Ben Wilson settle into a hand-holding exercise. (Aliko Weste)
Process undermines ‘Black brute’ narrative

Port Townsend company’s second film shot in Hawaii

Jefferson PUD to replace water main in Coyle

Jefferson PUD commissioners awarded a $1.3 million construction contract… Continue reading

Scott Mauk.
Chimacum superintendent receives national award

Chimacum School District Superintendent Scott Mauk has received the National… Continue reading

Hood Canal Coordinating Council meeting canceled

The annual meeting of the Hood Canal Coordinating Council, scheduled… Continue reading

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the rotunda of the old Clallam County Courthouse on Friday in Port Angeles. The North Olympic History Center exhibit tells the story of the post office past and present across Clallam County. The display will be open until early February, when it will be relocated to the Sequim City Hall followed by stops on the West End. The project was made possible due to a grant from the Clallam County Heritage Advisory Board. (Dave Logan/for Peninsula Daily News)
Post office past and present

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the… Continue reading

This agave grew from the size of a baseball in the 1990s to the height of Isobel Johnston’s roof in 2020. She saw it bloom in 2023. Following her death last year, Clallam County Fire District 3 commissioners, who purchased the property on Fifth Avenue in 2015, agreed to sell it to support the building of a new Carlsborg fire station. (Matthew Nash/Olympic Peninsula News Group file)
Fire district to sell property known for its Sequim agave plant

Sale proceeds may support new Carlsborg station project

As part of Olympic Theatre Arts’ energy renovation upgrade project, new lighting has been installed, including on the Elaine and Robert Caldwell Main Stage that allows for new and improved effects. (Olympic Theatre Arts)
Olympic Theatre Arts remodels its building

New roof, LED lights, HVAC throughout

Weekly flight operations scheduled

Field carrier landing practice operations will be conducted for aircraft… Continue reading

Workers from Van Ness Construction in Port Hadlock, one holding a grade rod with a laser pointer, left, and another driving the backhoe, scrape dirt for a new sidewalk of civic improvements at Walker and Washington streets in Port Townsend on Thursday. The sidewalks will be poured in early February and extend down the hill on Washington Street and along Walker Street next to the pickle ball courts. (Steve Mullensky/for Peninsula Daily News)
Sidewalk setup

Workers from Van Ness Construction in Port Hadlock, one holding a grade… Continue reading