Clallam commissioners expected to approve closure of Quillayute Road bridge Tuesday

Engineer: Span damaged by over-height load

PORT ANGELES — The Clallam County commissioners are expected to approve an emergency closure of the Sol Duc River bridge on Quillayute Road on Tuesday.

County Engineer Ross Tyler told the commissioners during a work session Monday that the bridge sustained structural damage when it took a “significant hit” from an over-height load April 5 and that he does not want to risk more damage to the bridge.

“I’m just not comfortable leaving it open,” Tyler said. “We can’t have loads on the bridge if we have fear that it’s going to damage it further or collapse.”

Tyler said that collapse isn’t imminent, but he does not want any more damage to be done to the bridge before it is repaired.

Had the damage been so severe that bridge failure was imminent, it would have been closed immediately and before going to the Board of County Commissioners, Tyler said.

“We’ve got the authority to close something on an emergency basis without commissioner approval,” he said. “We do have the power to close it and we would have done so if we felt we needed to do it right then. That’s something we’re required to do.”

He said county engineers had discussed other alternatives to closure, such as allowing smaller vehicles or limiting the bridge to one-way traffic, but said a complete closure would be less confusing.

Tyler did not provide a timeline for the closure to commissioners, but said in a phone interview that it could be mid- to late May before the bridge is reopened.

He estimated the repairs could cost around $10,000 or $15,000.

The bridge remained open Monday and will remain open until the commissioners take action at their 10 a.m. meeting Tuesday. They will consider whether to close Quillayute Road between milepost 6.42 and milepost 6.75 west of Forks.

Commissioner Randy Johnson said there was little doubt in his mind that the bridge will be closed.

“If my engineer tells me it’s a concern of his, we don’t need to wait a long time,” Johnson said. “In my mind that needs to go to the top as soon as we can do it.”

Quillayute Road connects La Push Road to Mora Road and provides access to the Quillayute Airport.

Logging trucks accessing timberland up Mina Smith Road make up much of the traffic on the road, Tyler said. They will need to route to Mora Road to access state Highway 110.

“We’ll get it signed up well,” he said.

________

Reporter Jesse Major can be reached at 360-452-2345, ext. 56250, or at jmajor@peninsuladailynews.com.

More in News

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend, volunteer at the Martin Luther King Day of Service beach restoration on Monday at Fort Worden State Park. The activity took place on Knapp Circle near the Point Wilson Lighthouse. Sixty-four volunteers participated in the removal of non-native beach grasses. (Steve Mullensky/for Peninsula Daily News)
Work party

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend,… Continue reading

Portion of bridge to be replaced

Tribe: Wooden truss at railroad park deteriorating

Kingsya Omega, left, and Ben Wilson settle into a hand-holding exercise. (Aliko Weste)
Process undermines ‘Black brute’ narrative

Port Townsend company’s second film shot in Hawaii

Jefferson PUD to replace water main in Coyle

Jefferson PUD commissioners awarded a $1.3 million construction contract… Continue reading

Scott Mauk.
Chimacum superintendent receives national award

Chimacum School District Superintendent Scott Mauk has received the National… Continue reading

Hood Canal Coordinating Council meeting canceled

The annual meeting of the Hood Canal Coordinating Council, scheduled… Continue reading

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the rotunda of the old Clallam County Courthouse on Friday in Port Angeles. The North Olympic History Center exhibit tells the story of the post office past and present across Clallam County. The display will be open until early February, when it will be relocated to the Sequim City Hall followed by stops on the West End. The project was made possible due to a grant from the Clallam County Heritage Advisory Board. (Dave Logan/for Peninsula Daily News)
Post office past and present

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the… Continue reading

This agave grew from the size of a baseball in the 1990s to the height of Isobel Johnston’s roof in 2020. She saw it bloom in 2023. Following her death last year, Clallam County Fire District 3 commissioners, who purchased the property on Fifth Avenue in 2015, agreed to sell it to support the building of a new Carlsborg fire station. (Matthew Nash/Olympic Peninsula News Group file)
Fire district to sell property known for its Sequim agave plant

Sale proceeds may support new Carlsborg station project

As part of Olympic Theatre Arts’ energy renovation upgrade project, new lighting has been installed, including on the Elaine and Robert Caldwell Main Stage that allows for new and improved effects. (Olympic Theatre Arts)
Olympic Theatre Arts remodels its building

New roof, LED lights, HVAC throughout

Weekly flight operations scheduled

Field carrier landing practice operations will be conducted for aircraft… Continue reading

Workers from Van Ness Construction in Port Hadlock, one holding a grade rod with a laser pointer, left, and another driving the backhoe, scrape dirt for a new sidewalk of civic improvements at Walker and Washington streets in Port Townsend on Thursday. The sidewalks will be poured in early February and extend down the hill on Washington Street and along Walker Street next to the pickle ball courts. (Steve Mullensky/for Peninsula Daily News)
Sidewalk setup

Workers from Van Ness Construction in Port Hadlock, one holding a grade… Continue reading