Clallam commissioner opposes water bank idea

Jim McEntire wrote to the state Department of Ecology asking for an alternative to a water bank.

Jim McEntire wrote to the state Department of Ecology asking for an alternative to a water bank.

SEQUIM — Clallam County Commissioner Jim McEntire, in a letter to the state Department of Ecology director overseeing the proposed Dungeness Valley watershed’s in-stream flow rule, asks Ecology for a simpler alternative to a water bank and the administrative costs that come with it.

“The state capital budget can support purchase or lease of additional in-stream flow conservation, and therefore groundwater withdrawal mitigation, obviating the need for a local water bank,” McEntire wrote in a May 1 letter to Ecology Director Ted Sturdevant, who heads the agency that on Wednesday will release a second preliminary in-stream flow rule.

According to the Dungeness Water Users Association, McEntire — who was not speaking for the entire commission — said more conservation projects will yield a substantial additional reductions in Dungeness River water withdrawals, which can be distributed to mitigate groundwater withdrawals.

The Sequim Republican recommends that the Legislature allot one-time funds from its capital budget earmarked for additional water conservation measures, including lining and piping Dungeness Valley irrigation ditches to stem water seepage and evaporation losses, and creating an underground reservoir in which surface water is injected into the ground, commonly called “aquifer recharge.”

A water bank, as Ecology proposes for future homes and businesses that cannot hook up to existing water supplies, would allow them to buy water rights through the Dungeness Water Exchange developed by the Clallam County, Ecology and Washington Water Trust.

Under the proposal, new homes can still be built in areas already served by Clallam County Public Utility District or other small water utilities or communities with existing wells.

The rule would affect the eastern half of Water Resource Inventory Area 18 from Bagley Creek to Sequim Bay.

The in-stream flow rule is intended to protect and preserve water for fish, farmers, residents, wildlife and recreation.

As proposed, it limits water usage by new homeowners and requires metering of new wells to protect water supplies and viable fish habitat during the drought season in the late summer and early fall.

It would not affect existing homes with working wells.

McEntire, who said he supports the rule, calls for “the most appropriate balance of the needs for fish and people, while having the smallest impact on our local economy.”

The first-come, first-served state law covering the individual’s right to beneficially use water means new users must not impair the use of those with water rights who came before them.

Bottom line: If water is scarce, there is not sufficient supply for a new water user to obtain a permit to build a new home.

There is a way, however, to prevent such a water crisis from happening and avoid conflict with economic growth.

About 20 wells existed in 1970 in the Dungeness Valley compared with hundreds today.

“It’s very clear in the statutes that it’s the public that owns the water in the state,” McEntire said.

“The idea to me at least is the try to leave the maximum amount of water in the stream or don’t take it out.

“We have been very successful over the years through conservation.”

McEntire said he has extensively discussed the water bank and general water rule at length with Dungeness Valley home building and real estate representatives.

________

Sequim-Dungeness Valley Editor Jeff Chew can be reached at 360-681-2390, extension 5052 or at jeff.chew@peninsuladailynews.com.

More in News

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend, volunteer at the Martin Luther King Day of Service beach restoration on Monday at Fort Worden State Park. The activity took place on Knapp Circle near the Point Wilson Lighthouse. Sixty-four volunteers participated in the removal of non-native beach grasses. (Steve Mullensky/for Peninsula Daily News)
Work party

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend,… Continue reading

Portion of bridge to be replaced

Tribe: Wooden truss at railroad park deteriorating

Kingsya Omega, left, and Ben Wilson settle into a hand-holding exercise. (Aliko Weste)
Process undermines ‘Black brute’ narrative

Port Townsend company’s second film shot in Hawaii

Jefferson PUD to replace water main in Coyle

Jefferson PUD commissioners awarded a $1.3 million construction contract… Continue reading

Scott Mauk.
Chimacum superintendent receives national award

Chimacum School District Superintendent Scott Mauk has received the National… Continue reading

Hood Canal Coordinating Council meeting canceled

The annual meeting of the Hood Canal Coordinating Council, scheduled… Continue reading

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the rotunda of the old Clallam County Courthouse on Friday in Port Angeles. The North Olympic History Center exhibit tells the story of the post office past and present across Clallam County. The display will be open until early February, when it will be relocated to the Sequim City Hall followed by stops on the West End. The project was made possible due to a grant from the Clallam County Heritage Advisory Board. (Dave Logan/for Peninsula Daily News)
Post office past and present

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the… Continue reading

This agave grew from the size of a baseball in the 1990s to the height of Isobel Johnston’s roof in 2020. She saw it bloom in 2023. Following her death last year, Clallam County Fire District 3 commissioners, who purchased the property on Fifth Avenue in 2015, agreed to sell it to support the building of a new Carlsborg fire station. (Matthew Nash/Olympic Peninsula News Group file)
Fire district to sell property known for its Sequim agave plant

Sale proceeds may support new Carlsborg station project

As part of Olympic Theatre Arts’ energy renovation upgrade project, new lighting has been installed, including on the Elaine and Robert Caldwell Main Stage that allows for new and improved effects. (Olympic Theatre Arts)
Olympic Theatre Arts remodels its building

New roof, LED lights, HVAC throughout

Weekly flight operations scheduled

Field carrier landing practice operations will be conducted for aircraft… Continue reading

Workers from Van Ness Construction in Port Hadlock, one holding a grade rod with a laser pointer, left, and another driving the backhoe, scrape dirt for a new sidewalk of civic improvements at Walker and Washington streets in Port Townsend on Thursday. The sidewalks will be poured in early February and extend down the hill on Washington Street and along Walker Street next to the pickle ball courts. (Steve Mullensky/for Peninsula Daily News)
Sidewalk setup

Workers from Van Ness Construction in Port Hadlock, one holding a grade… Continue reading