The Cable Innovator is pictured at Terminal One in the Port of Port Angeles. (David Sellars/for Peninsula Daily News)

The Cable Innovator is pictured at Terminal One in the Port of Port Angeles. (David Sellars/for Peninsula Daily News)

Cable Innovator captain tells of the vessel’s work

PORT ANGELES — It’s something like plucking a needle from a haystack.

The Cable Innovator, a 476-foot vessel that left Saturday after it had been moored to the Port of Port Angeles’ Terminal One since Sept. 21, has the capability of reaching more than 6,000 feet down into the sea and retrieving a cable no bigger than six pencils taped together.

Late Wednesday afternoon, my wife, Mardi, and I boarded the ship, which was built in 1995 by Kvaerner Masa-Yards in Helsinki, Finland, along with a large contingent from Port Angeles.

We were there for a tour of the world’s first purpose-built stern-working cable-laying vessel.

Others joining us included Port Angeles City Councilman Dan Gase; County Commissioners Randy Johnson and Bill Peach; Mike Nimmo and Dan Shea, who keep the terminals running smoothly; Port of Port Angeles Executive Director Karen Goschen; Kevin Hoult, an adviser with the Small Business Development Center; and Port of Port Angeles Commissioners Steve Burke and Connie Beauvais.

We assembled in the bar area where Capt. Paul Hajnes welcomed us aboard his ship — which flies a United Kingdom flag and is manned by a predominately British crew — and invited us to partake of light tea, which was waiting for us.

In his opening remarks, the captain said the first five years Cable Innovator was in service were boom years for the laying of fiber-optic cable, but now the bread and butter of the business is in cable maintenance.

The vessel, which is owned by Global Marine Systems, is now a station ship at Global Marine Systems North Pacific base at Victoria with a contract to make repairs as necessary to the numerous cables that crisscross the Pacific Ocean.

It shares space with cruise ships and has to go out to anchorage when cruise ships fill the berths at Ogden Point

While here, the cable ship refueled.

Tours were given of the bridge and down below in the space where the retrieval and repair of the cable takes place.

The area where the cable is repaired is fascinating.

Four tanks in the ship hold miles of fiber-optic cable. The ship is ready for any contingency when it goes out to make a repair, which by contract can be made to a depth of 6,562 feet.

The cable can be brought to the surface by a remotely operated submersible vehicle or by a grapple system from the stern of the ship. For a video on the process of cable retrieval and repair, see www.globalmarine.co.uk/maintenance.html.

Global Marine, based in England, provides sub-sea cable maintenance services to almost 100 customers around the globe to keep their fiber-optic cable systems operational.

As to how cables languidly lying on the bottom of the ocean become damaged, we were told there are many ways.

They can be damaged by seismic activity and tsunamis; in shallow water as in the Philippines, fisherman dragging their gear across cable is often a culprit, as are ships dropping their anchors.

The captain said he was impressed with the services the Port of Port Angeles made available to his vessel.

The most impressive, he said, was the shore power.

Initially he was skeptical. He said he expected to see the lights in the city dim once the ship was connected. He was pleased to see that once the ship had power, the lights in the city remained on as well.

At the conclusion of the tours, we congregated in the bar area known as the Mucky Duck and enjoyed a couple of libations and delicious canapés before dining in the ship’s dining room with the captain and his crew.

A toast of port wine honoring the queen of England and the president of the United States concluded our dinner.

________

David Sellars has been on hiatus from his column, On the Waterfront, in the Peninsula Daily News.

Cable Innovator Capt. Paul Hajnes. (David Sellars/for Peninsula Daily News)

Cable Innovator Capt. Paul Hajnes. (David Sellars/for Peninsula Daily News)

A cable handling drum in the tank area of the ship. (David Sellars/for Peninsula Daily News)

A cable handling drum in the tank area of the ship. (David Sellars/for Peninsula Daily News)

An A-frame used to bring cable onto the ship for repair and to deploy the remotely operated submersible vehicle. (David Sellars/for Peninsula Daily News)

An A-frame used to bring cable onto the ship for repair and to deploy the remotely operated submersible vehicle. (David Sellars/for Peninsula Daily News)

Cable handling equipment on the tank deck. (David Sellars/for Peninsula Daily News)

Cable handling equipment on the tank deck. (David Sellars/for Peninsula Daily News)

More in News

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend, volunteer at the Martin Luther King Day of Service beach restoration on Monday at Fort Worden State Park. The activity took place on Knapp Circle near the Point Wilson Lighthouse. Sixty-four volunteers participated in the removal of non-native beach grasses. (Steve Mullensky/for Peninsula Daily News)
Work party

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend,… Continue reading

Portion of bridge to be replaced

Tribe: Wooden truss at railroad park deteriorating

Kingsya Omega, left, and Ben Wilson settle into a hand-holding exercise. (Aliko Weste)
Process undermines ‘Black brute’ narrative

Port Townsend company’s second film shot in Hawaii

Jefferson PUD to replace water main in Coyle

Jefferson PUD commissioners awarded a $1.3 million construction contract… Continue reading

Scott Mauk.
Chimacum superintendent receives national award

Chimacum School District Superintendent Scott Mauk has received the National… Continue reading

Hood Canal Coordinating Council meeting canceled

The annual meeting of the Hood Canal Coordinating Council, scheduled… Continue reading

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the rotunda of the old Clallam County Courthouse on Friday in Port Angeles. The North Olympic History Center exhibit tells the story of the post office past and present across Clallam County. The display will be open until early February, when it will be relocated to the Sequim City Hall followed by stops on the West End. The project was made possible due to a grant from the Clallam County Heritage Advisory Board. (Dave Logan/for Peninsula Daily News)
Post office past and present

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the… Continue reading

This agave grew from the size of a baseball in the 1990s to the height of Isobel Johnston’s roof in 2020. She saw it bloom in 2023. Following her death last year, Clallam County Fire District 3 commissioners, who purchased the property on Fifth Avenue in 2015, agreed to sell it to support the building of a new Carlsborg fire station. (Matthew Nash/Olympic Peninsula News Group file)
Fire district to sell property known for its Sequim agave plant

Sale proceeds may support new Carlsborg station project

As part of Olympic Theatre Arts’ energy renovation upgrade project, new lighting has been installed, including on the Elaine and Robert Caldwell Main Stage that allows for new and improved effects. (Olympic Theatre Arts)
Olympic Theatre Arts remodels its building

New roof, LED lights, HVAC throughout

Weekly flight operations scheduled

Field carrier landing practice operations will be conducted for aircraft… Continue reading

Workers from Van Ness Construction in Port Hadlock, one holding a grade rod with a laser pointer, left, and another driving the backhoe, scrape dirt for a new sidewalk of civic improvements at Walker and Washington streets in Port Townsend on Thursday. The sidewalks will be poured in early February and extend down the hill on Washington Street and along Walker Street next to the pickle ball courts. (Steve Mullensky/for Peninsula Daily News)
Sidewalk setup

Workers from Van Ness Construction in Port Hadlock, one holding a grade… Continue reading