A Washington Department of Transportation crew looks at a giant boulder that landed on U.S. Highway 101 near milepost 228 east of Barnes Point at Lake Crescent on Thursday. (Keith Thorpe/Peninsula Daily News)

A Washington Department of Transportation crew looks at a giant boulder that landed on U.S. Highway 101 near milepost 228 east of Barnes Point at Lake Crescent on Thursday. (Keith Thorpe/Peninsula Daily News)

Boulder blocks highway at Lake Crescent

OLYMPIC NATIONAL PARK — A boulder about 12 feet across fell onto U.S. Highway 101 early Thursday morning, blocking traffic until the afternoon and highlighting a concern about falling debris along Lake Crescent.

The state Department of Transportation anticipated falling rocks after the weather warmed up, but nothing like the boulder that fell Thursday, said Claudia Bingham Baker, Transportation spokeswoman.

She said state crews, who have been monitoring U.S. Highway 101 on Lake Crescent for falling debris since last weekend, discovered the boulder at about milepost 229 at about 2 a.m.

Crews had to wait until daylight to begin work and had the road back open by about 1:45 p.m., she said.

Crews pulled out the guardrail and used a bulldozer and excavator to push the boulder off the highway.

“The boulder wasn’t round, so it didn’t roll,” she said. “I don’t know if it ended up in the water.”

Crews then replaced the guardrail and patched the damaged pavement.

The rock measured about 9 feet by 7 feet by 12 feet, Bingham Baker said. She had no estimate of the rock’s weight.

She said one crew member who has worked that stretch of highway for many years remembers only three boulders ever falling into the road.

Two of those have have been in the past few months.

Another boulder, which blocked only one lane, fell onto the highway in November.

A tree fell earlier this month, killing a boy and injuring four others, on Highway 101 on Lake Crescent as well.

“The boulder coming down serves to underscore the importance of this big rehab project,” said Barb Maynes, spokeswoman for Olympic National Park.

The park has scheduled a 3-year project on Highway 101 along Lake Crescent to begin this spring, she said.

The park, along with the Federal Highway Administration as a cooperating agency, plans to replace sections of road bed, remove rock-fall hazards, repair or replace failing retaining walls and rotten guardrails, and repair culverts on 12.3 miles of the tourist and commuting route around the lake.

Part of the work includes rock scaling, which the park hasn’t done since 2012, Maynes said.

“It’s something we do periodically,” she said.

During rock scaling, crews will either knock hazardous rocks down or bolt them into place while also stabilizing cliff faces, she said.

The park has not yet awarded a contract for the project.

________

Reporter Jesse Major can be reached at 360-452-2345, ext. 56250, or at jmajor@peninsula dailynews.com.

More in News

Port Townsend Main Street Program volunteers, from left, Amy Jordan, Gillian Amas and Sue Authur, and Main Street employees, Sasha Landes, on the ladder, and marketing director Eryn Smith, spend a rainy morning decorating the community Christmas tree at the Haller Fountain on Wednesday. The tree will be lit at 4 p.m. Saturday following Santa’s arrival by the Kiwanis choo choo train. (Steve Mullensky/for Peninsula Daily News)
Decoration preparation

Port Townsend Main Street Program volunteers, from left, Amy Jordan, Gillian Amas… Continue reading

Port Angeles approves balanced $200M budget

City investing in savings for capital projects

Olympic Medical Center Board President Ann Henninger, left, recognizes commissioner Jean Hordyk on Wednesday as she steps down after 30 years on the board. Hordyk, who was first elected in 1995, was honored during the meeting. (Paula Hunt/Peninsula Daily News)
OMC Commissioners to start recording meetings

Video, audio to be available online

Jefferson PUD plans to keep Sims Way project overhead

Cost significantly reduced in joint effort with port, city

Committee members sought for ‘For’ and ‘Against’ statements

The Clallam County commissioners are seeking county residents to… Continue reading

Christopher Thomsen, portraying Santa Claus, holds a corgi mix named Lizzie on Saturday at the Airport Garden Center in Port Angeles. All proceeds from the event were donated to the Peninsula Friends of Animals. (Dave Logan/for Peninsula Daily News)
Santa Paws

Christopher Thomsen, portraying Santa Claus, holds a corgi mix named Lizzie on… Continue reading

Peninsula lawmakers await budget

Gov. Ferguson to release supplemental plan this month

Clallam County looks to pass deficit budget

Agency sees about 7 percent rise over 2025 in expenditures

Officer testifies bullet lodged in car’s pillar

Witness says she heard gunfire at Port Angeles park

A copper rockfish caught as part of a state Department of Fish and Wildlife study in 2017. The distended eyes resulted from a pressure change as the fish was pulled up from a depth of 250 feet. (David B. Williams)
Author to highlight history of Puget Sound

Talk at PT Library to cover naming, battles, tribes

Vern Frykholm, who has made more than 500 appearances as George Washington since 2012, visits with Dave Spencer. Frykholm and 10 members of the New Dungeness Chapter, NSDAR, visited with about 30 veterans on Nov. 8, just ahead of Veterans Day. (New Dungeness Chapter DAR)
New Dungeness DAR visits veterans at senior facilities

Members of the New Dungeness Chapter, National Society Daughters of… Continue reading

Festival of Trees contest.
Contest: Vote for your favorite tree online

Olympic Medical Center Foundation’s Festival of Trees event goes through Dec. 25