In this Friday photo provided by Reese Semanko

In this Friday photo provided by Reese Semanko

4th UPDATE — Protester leaves Shell oil-suport ship in Bellingham Bay; 1 remains

  • By The Associated Press
  • Sunday, May 24, 2015 12:21pm
  • News

By The Associated Press

BELLINGHAM — One of the two protesters who chained themselves to an Arctic oil-drilling support ship anchored in Bellingham Bay has left the vessel.

The Coast Guard reports that protester Matt Fuller requested help getting down from the Arctic Challenger’s anchor chain at about 4:30 a.m. Sunday.

The ship is part of a fleet Royal Dutch Shell plans to use to conduct exploratory drilling in the Chukchi Sea off northwestern Alaska this summer.

A student activist identified as Chiara D’Angelo suspended herself from the vessel’s anchor chain on Friday night, and Fuller joined her Saturday.

Local activist Jill MacIntyre Witt said Sunday that D’Angelo remains in place.

The Coast Guard said it brought Fuller to Coast Guard Station Bellingham, where he was met by medical staff and local police. He was not arrested.

——————-

OUR EARLIER STORY:

BELLINGHAM — Two people have chained themselves to a support ship for Royal Dutch Shell’s exploratory Arctic oil drilling plans.

Eric Ross of the Backbone Campaign said Saturday morning that Matt Fuller joined student activist Chiara Rose in suspending themselves from the anchor chain of the Arctic Challenger, which is in Bellingham Bay.

Rose suspended herself from the ship with a climbing harness Friday night.

The Coast Guard cutter Osprey — which is homeported in Port Townsend — spent the night monitoring Rose but took no action, Petty Officer 3rd Class Katelyn Shearer said Saturday morning.

“We’re really most concerned for her safety and the safety of everyone involved,” Shearer said.

Ross said both Rose and Fuller are fine and are not being harassed by the Coast Guard. But he expressed concern for Rose’s health and said she must be getting dehydrated and tired after her night above the water.

Authorities spoke with the woman and asked her to remove herself.

“There’s no plans right now to do anything further,” Shearer said.

The ship isn’t scheduled to leave the port for several days.

Rob Lewis, a spokesman for the Bellingham activists, said they are protesting Shell’s plan for Arctic drilling.

He described the Arctic Challenger as a savior vessel that is used in the case of an oil leak but said activists doubt its effectiveness at preventing environmental disasters like the Deepwater Horizon explosion in the Gulf of Mexico.

He confirmed that the Coast Guard was not interfering with Rose but that they had impounded the activists’ support vessels.

Protesters in Seattle have been demonstrating against another part of the Shell drilling fleet.

Dutch Shell is using Seattle’s seaport terminal to house a massive floating drill rig, the Polar Pioneer, which was towed to Seattle’s Elliott Bay after spending almost a month in Port Angeles Harbor.

Last weekend, hundreds of activists in kayaks swarmed Elliott Bay to protest Shell’s plans to drill for oil in the Arctic. The protest was dubbed the “Paddle in Seattle.”

Those activists have also expressed concern about the risk of an oil spill in the remote Arctic waters and the effect of Shell’s operations on global warming.

Minor damage by barge

On Friday, an official with the state Department of Natural Resources said activists protesting Shell’s plans did some damage to a Seattle dive park.

DNR spokesman Joe Smillie said divers found cement blocks, cables and chains that were used to anchor a 4,000-square-foot protest barge while the kayakers protested last weekend.

Smillie said damage was minimal to the marine habitat, and no one will be fined. But the protesters will have to pay for the cleanup.

“It caught us by surprise. We clearly didn’t have any intention of doing damage to a dive park. It was an honest mistake,” says John Sellers, a Vashon Island resident who led the protest-barge campaign.

[Smillie is a former reporter for the Peninsula Daily News.]

More in News

Ned Hammar, left, is sworn in as Port Angeles School District Position 2 director by Clallam County Superior Court Judge Simon Barnhart on Thursday as Superintendent Michelle Olsen looks on. (Paula Hunt/Peninsula Daily News)
Hammar, Hamilton sworn in to PASD board of directors

Major foundation work complete on Hurricane Ridge Middle School

Port Townsend plan may bump housing stock

Citizens concerned it may not be affordable

Port of Port Townsend reports strong revenues

Staffing changes, job vacancies contribute to net gain, official says

x
Grant funds help teen meal program at clubs

Boys, girls learning how to prepare nutritious dinners

EYE ON THE PENINSULA: Budget planning set for boards, commissions

Meetings across the North Olympic Peninsula

Donna Bower, left, and Kristine Konapaski, volunteers from the Michael Trebert Chapter of the Daughters of the American Revolution, unload one of the 115 boxes of Christmas wreaths and carry it to a waiting truck. (Dave Logan/For Peninsula Daily News)
Wreaths arrive for veterans

Donna Bower, left, and Kristine Konapaski, volunteers from the Michael Trebert Chapter… Continue reading

Coalition working to expand system

Anderson Lake section of ODT to open in ’26

Jefferson PUD cost of service study suggests increases

Biggest impact would be on sewer customers

Remains in shoe determined to belong to a bear

A shoe found earlier this week on the beach at… Continue reading

Clallam 2 Fire-Rescue personnel fight a residential structure fire in the 2000 Block of Dan Kelly Road on Wednesday. (Clallam 2 Fire Rescue)
Fire districts respond to structure fire on Dan Kelly Road

A home suffered significant damage to its roof following… Continue reading

Military accepting public comment on environmental impact statement

The U.S. Navy and U.S. Coast Guard are accepting public… Continue reading

Patrick Zolpi-Mikols, a park aide with Fort Worden State Park, gathers and removes leaves covering the storm drains after an atmospheric river rainstorm early Wednesday morning in Port Townsend. A flood warning was issued by the National Weather Service until 11:11 a.m. today for the Elwha River at the McDonald Bridge in Clallam County. With the flood stage at 20 feet, the Elwha River was projected to rise to 23.3 feet late Wednesday afternoon and then fall below flood stage just after midnight. (Steve Mullensky/for Peninsula Daily News)
Cleaning storm drains

Patrick Zolpi-Mikols, a park aide with Fort Worden State Park, gathers and… Continue reading