3 vie for interim foot ferry service to Whidbey Island

PORT TOWNSEND — Two North Olympic Peninsula passenger ferry operations are among three vying to provide Port Townsend-Keystone service while the 50-car Steilacoom II is in dry dock for annual maintenance in January.

“We will have a decision in the next few days,” said Hadley Greene, Washington State Ferries spokeswoman.

Those that answered a state ferries request for proposals late last week are Port Townsend’s Puget Sound Express, which normally runs whale-watching charters to the San Juan Islands, Port Angeles-based Victoria Express, which makes summertime runs to Victoria and Friday Harbor, and Mystic Sea Charters, an Anacortes-based charter operation.

As proposed, the Pierce County-owned Steilacoom II ferry, which the state leased last February, would be taken out of service Jan. 4 for inspection and maintenance required annually by the U.S. Coast Guard.

It will be out of service for an estimated four weeks.

P.S. Express operated on the route for a short period nearly a year ago before the Steilacoom II was brought to Port Townsend.

The Steilacoom II is the only vehicle ferry in the region that can handle Keystone Harbor’s challenging shallow conditions.

The car ferry temporarily replaced the two 80-year-old Steel Electric ferries, which were declared unsafe and pulled from the Port Townsend-Keystone route on Nov. 20, 2007.

A 60-car ferry is in the process of being designed and constructed in the next 18 months by Todd Pacific Shipyards of Seattle.

Nine round trips

Greene said the chosen passenger-ferry operator will provide nine round trips a day — the same as the Steilacoom II — but the schedule will be adjusted to match transit connections on the Port Townsend and Whidbey Island sides of Admiralty Inlet.

State ferries will install barges in the vessel slips at both the Port Townsend and Keystone terminals to allow the passenger vessel to land safely and make it easier for passengers to load and unload.

The barges meet federal disabled-accessibility standards and provide direct access to the Port Townsend and Keystone terminals.

Beginning Jan. 5, the Port Townsend/Keystone passenger-only sailing schedule will be:

•âÇLeaving Port Townsend at 6:20 a.m., 8:15 a.m., 10:15 a.m., 12:15 p.m., 2:15 p.m., 3:50 p.m., 5:20 p.m., 7 p.m. and 8:30 p.m.

•âÇLeaving Keystone at 7:10 a.m., 9:10 a.m., 11:10 a.m., 1:10 p.m., 3:10 p.m., 4:35 p.m., 6:10 p.m., 7:45 p.m. and 9:15 p.m.

Passenger fares will remain the same — $2.60 for a one-way full fare.

Wave2Go multi-ride cards will be accepted. The vehicle-holding lanes at both terminals will serve as park-and-ride lots for passengers.

The temporary passenger-only schedule is designed to coordinate as closely as possible with transit service on both sides of the route.

Customers looking for information on transit connections can phone Island Transit at 360-321-6688, ext. 3 or toll free 800-240-8747, or Jefferson Transit at 800-371-0497.

________

Port Townsend-Jefferson County Editor Jeff Chew can be reached at 360-385-2335 or at jeff.chew@peninsula dailynews.com.

More in News

Two dead after tree falls in Olympic National Forest

Two women died after a tree fell in Olympic National… Continue reading

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend, volunteer at the Martin Luther King Day of Service beach restoration on Monday at Fort Worden State Park. The activity took place on Knapp Circle near the Point Wilson Lighthouse. Sixty-four volunteers participated in the removal of non-native beach grasses. (Steve Mullensky/for Peninsula Daily News)
Work party

Sue Long, left, Vicki Bennett and Frank Handler, all from Port Townsend,… Continue reading

Portion of bridge to be replaced

Tribe: Wooden truss at railroad park deteriorating

Kingsya Omega, left, and Ben Wilson settle into a hand-holding exercise. (Aliko Weste)
Process undermines ‘Black brute’ narrative

Port Townsend company’s second film shot in Hawaii

Jefferson PUD to replace water main in Coyle

Jefferson PUD commissioners awarded a $1.3 million construction contract… Continue reading

Scott Mauk.
Chimacum superintendent receives national award

Chimacum School District Superintendent Scott Mauk has received the National… Continue reading

Hood Canal Coordinating Council meeting canceled

The annual meeting of the Hood Canal Coordinating Council, scheduled… Continue reading

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the rotunda of the old Clallam County Courthouse on Friday in Port Angeles. The North Olympic History Center exhibit tells the story of the post office past and present across Clallam County. The display will be open until early February, when it will be relocated to the Sequim City Hall followed by stops on the West End. The project was made possible due to a grant from the Clallam County Heritage Advisory Board. (Dave Logan/for Peninsula Daily News)
Post office past and present

Bruce Murray, left, and Ralph Parsons hang a cloth exhibition in the… Continue reading

This agave grew from the size of a baseball in the 1990s to the height of Isobel Johnston’s roof in 2020. She saw it bloom in 2023. Following her death last year, Clallam County Fire District 3 commissioners, who purchased the property on Fifth Avenue in 2015, agreed to sell it to support the building of a new Carlsborg fire station. (Matthew Nash/Olympic Peninsula News Group file)
Fire district to sell property known for its Sequim agave plant

Sale proceeds may support new Carlsborg station project

As part of Olympic Theatre Arts’ energy renovation upgrade project, new lighting has been installed, including on the Elaine and Robert Caldwell Main Stage that allows for new and improved effects. (Olympic Theatre Arts)
Olympic Theatre Arts remodels its building

New roof, LED lights, HVAC throughout

Weekly flight operations scheduled

Field carrier landing practice operations will be conducted for aircraft… Continue reading