15-ton lump of congealed fat, wet wipes clogs London sewer

  • By Peninsula Daily News news services
  • Wednesday, August 7, 2013 1:04pm
  • News

By Peninsula Daily News news services

LONDON —

Sewer workers have removed what they believe to be Britain’s biggest ever “fatberg” — a festering lump of flushed-away fat and other residues — from a London sewer in a special operation that took 10 nights.

The blockage was discovered on July 17 when residents of the affluent southwestern suburb of Kingston upon Thames reported trouble with flushing their toilets.

A video posted online Tuesday shows the moment a remote camera discovered the enormous lump, which weighed as much as two fully grown African elephants.

“The sewer was almost completely clogged with over 15 tons of fat,” said Gordon Hailwood, water contracts supervisor for the local water utility, Thames Water.

Workers used a high-pressure water jet to remove the blockage from the Victorian-era sewer, according to Graeme Sanderson of CountyClean Environmental Services, the company that performed the work.

“The mound of fat had reduced the 70-by-48-centimetre sewer to just 5 per cent of its normal capacity,” Sanderson wrote online.

Fatbergs build up in sewer systems as fat, oil and grease are transported along with raw sewage.

Once a fat deposit forms on a sewer wall, other fat tends to build up on the site, causing wrongly flushed items such as wet wipes and sanitary items to stick to it.

Just as cholesterol can slowly constrict human arteries, the fat buildups can go unnoticed until they constrict the sewer, with catastrophic, or at least disgusting, consequences.

“If we hadn’t discovered it in time, raw sewage could have started spurting out of manholes across the whole of Kingston,” Hailwood said.

The sewer was damaged by the enormous deposit, Hailwood said, and repairs would take six weeks.

Fatbergs often form after special occasions such as Christmas, when many households simultaneously pour fat and oil from a large meal down the drain.

Although fatbergs pose problems for sewer systems, they are also a potential source of energy that would otherwise go to waste.

In April, Thames Water signed a 20-year deal with energy firm 20C to generate renewable electricity from fats and oils retrieved from the Beckton treatment works in east London.

More in News

Crews work to remove metal siding on the north side of Field Arts & Events Hall on Thursday in Port Angeles. The siding is being removed so it can be replaced. (Dave Logan/for Peninsula Daily News)
Siding to be replaced

Crews work to remove metal siding on the north side of Field… Continue reading

Tsunami study provides advice

Results to be discussed on Jan. 20 at Field Hall

Chef Arran Stark speaks with attendees as they eat ratatouille — mixed roasted vegetables and roasted delicata squash — that he prepared in his cooking with vegetables class. (Elijah Sussman/Peninsula Daily News)
Nonprofit school is cooking at fairgrounds

Remaining lectures to cover how to prepare salmon and chicken

Port Townsend Main Street Program volunteers, from left, Amy Jordan, Gillian Amas and Sue Authur, and Main Street employees, Sasha Landes, on the ladder, and marketing director Eryn Smith, spend a rainy morning decorating the community Christmas tree at the Haller Fountain on Wednesday. The tree will be lit at 4 p.m. Saturday following Santa’s arrival by the Kiwanis choo choo train. (Steve Mullensky/for Peninsula Daily News)
Decoration preparation

Port Townsend Main Street Program volunteers, from left, Amy Jordan, Gillian Amas… Continue reading

Port Angeles approves balanced $200M budget

City investing in savings for capital projects

Olympic Medical Center Board President Ann Henninger, left, recognizes commissioner Jean Hordyk on Wednesday as she steps down after 30 years on the board. Hordyk, who was first elected in 1995, was honored during the meeting. (Paula Hunt/Peninsula Daily News)
OMC Commissioners to start recording meetings

Video, audio to be available online

Jefferson PUD plans to keep Sims Way project overhead

Cost significantly reduced in joint effort with port, city

Committee members sought for ‘For’ and ‘Against’ statements

The Clallam County commissioners are seeking county residents to… Continue reading

Christopher Thomsen, portraying Santa Claus, holds a corgi mix named Lizzie on Saturday at the Airport Garden Center in Port Angeles. All proceeds from the event were donated to the Peninsula Friends of Animals. (Dave Logan/for Peninsula Daily News)
Santa Paws

Christopher Thomsen, portraying Santa Claus, holds a corgi mix named Lizzie on… Continue reading

Peninsula lawmakers await budget

Gov. Ferguson to release supplemental plan this month

Clallam County looks to pass deficit budget

Agency sees about 7 percent rise over 2025 in expenditures

Officer testifies bullet lodged in car’s pillar

Witness says she heard gunfire at Port Angeles park