The new classroom structure at Railroad Bridge Park will include a shingled round roof that resembles a traditional “potlatch” hat. (Graphic courtesy of Dungeness River Nature Center)

The new classroom structure at Railroad Bridge Park will include a shingled round roof that resembles a traditional “potlatch” hat. (Graphic courtesy of Dungeness River Nature Center)

Construction starts on outdoor classroom at Dungeness center

Building to be shaped like traditional cedar hat

SEQUIM — Construction is now underway for a new outdoor classroom at the Dungeness River Nature Center.

When not in use, the classroom, like all the spaces inside the River Center, will be available to be leased by the public for private events and also will be accessible for supply vehicles, center representatives said.

Work began on the new classroom Aug. 15 and is expected to be complete in early January 2023, they said.

The new outdoor classroom, located adjacent to the park-host site south of the River Center, will have space for 30 students.

The building includes plumbing, electricity, a restroom, storage and three roll-up doors that can be opened for an “outside” feel and closed for security. The building will be ADA accessible.

“As a longtime educator at the Center and Park, I am thrilled for the addition of this classroom space that will be used to create meaningful outdoor experiences for all ages,” River Center director Powell Jones said in a press release.

“Having a dedicated space for our outdoor classes, in such a beautiful design, emphasizes our commitment to outdoor education and is the perfect finishing piece to our floodplain restoration project.”

Rooted in Coast Salish design, the new classroom’s shingled round roof will resemble a traditional “potlatch” hat.

These hats are woven from cedar strips and worn by the person hosting a potlatch; the hat is added to in height for each potlatch hosted.

The building’s ceiling and columns will be constructed of unpainted, red cedar.

Landscaping will enclose the building, and a trail through the woods will lead school children disembarking from school buses from the parking lot to the classroom structure.

The new building was designed by Kirk Nelson, Jamestown S’Klallam senior construction manager, with input from Jones. Final drawings were produced by Otak, an engineering firm based in Vancouver, Wash.; the classroom is being built by Clark Construction of Bainbridge Island.

The new classroom is paid for by the “Floodplains for Design” grant as part of the Jamestown Tribe’s removal of the 1960-era levee, parking lot mitigation and salmon passage.

The grant also funds a new “wishbone” style bridge from the historic railroad trestle that will adjoin the existing Olympic Discovery Trail; a separate span will link the River Center’s plaza to the bridge.

The project coincides with installation of the River Center’s exhibit hall set for mid-October, and completion of the salmon restoration project in Railroad Bridge Park.

Built in the woods by volunteers some two decades ago and used by center education staff to teach both children and adults, the River Center’s picnic shelter and amphitheater were removed in June to make way for the river restoration project.

Over the years, more than 20,000 students began their field trips at the picnic shelter before donning black rubber boots and wading into the Dungeness for watershed studies.

The amphitheater, which seated 100, was used for “Learning by the Light of the Moon” musical performances and ceremonial events.

Activities held in the amphitheater will be reinvented and held in the new plaza, which can seat up to 300 with a performance space just outside the center’s doors.

________

Michael Dashiell is the editor of the Sequim Gazette of the Olympic Peninsula News Group, which also is composed of other Sound Publishing newspapers Peninsula Daily News and Forks Forum. Reach him at editor@sequimgazette.com.

More in Life

Cheryl Grey.
Author’s fiction novel addresses healing of Elwha River valley

Story connects biology with tribe following the removal of dams

Calla lilies as tall in January as they would normally be on May 1. Native to Central America,  it is unheard of to see callas so advanced this time of year. (Andrew May/For Peninsula Daily News)
A GROWING CONCERN: There’s too much spring in our step

THIS spring weather! As a very good old Wisconsin… Continue reading

ISSUES OF FAITH: Not too late to make better choices

RECENTLY, I SHARED a story with my family at the dinner table,… Continue reading

M.E. Bartholomew
Unity speaker slated for weekend service

M.E. Bartholomew will present “You Have a Choice” at… Continue reading

The Rev. Bruce Bode
Bode scheduled for OUUF weekend program

The Rev. Bruce Bode will present “Follow Your Bliss”… Continue reading

The Rev. Pam Douglas-Smith
Program planned for Sunday service in Port Townsend

The Rev. Pam Douglas-Smith will present “Barefoot on Holy… Continue reading

A GROWING CONCERN: Seven reasons to prune your plants

THE WONDERFUL WARM weather, although a great treat for us, is not… Continue reading

a
HORSEPLAY: Ponies: Little packages with lots of personality

THEY’RE BOTH sugar and spice, naughty and nice! I just… Continue reading

Rev. Ben Nicodemus
New pastor to be installed Saturday

There will be an installation ceremony for Rev. Ben… Continue reading

Doug Benecke will be joined by Sallie Harrison for special music at 10:30 a.m. Sunday.
Program set for weekend service

The Rev. Doug Benecke will present “The Little Things… Continue reading

Gate city ladder crew.
BACK WHEN: Port Angeles, still the Puget Sound’s Gate City

IN THE EARLY days of Port Angeles, civic leaders had a vision… Continue reading

ISSUES OF FAITH: Imagine a new world

WITH THE HOLIDAYS behind us, after we have sent gifts, well wishes… Continue reading